-
Description: Design of “Bridge construction in Bardhaj village, Lumas Administratvive Unit”, Kuçova Municipality, Berat District.
Contractor: Kuçova Municipality
Period: 2022
-
Description: Design of “Asphalting and Rehabilitation of roads for 4 Shtatori neighborhood”, Dimal Municipality, Berat District
Contractor: Dimal Municipality
Period: 2022
-
Description: Design of “Reconstruction of the road Pashali-Konisbaltë”, Dimal Municipality, Berat District
Contractor: Dimal Municipality
Period: 2022
-
Description: "Project Design: “Construction of 3 Educational facilities: Gymnasium “At Shtjefën Kurti”, school “Nik Tom Prela” and Kindergarten No. 3, Laç”, in the new area for the development,...
-
Description: "Project Design: "Construction of facilities: "Shenjta Mari" Hospital, Directorate of Public Health (former Infectious Disease Hospital) and the New kindergarden", Rrëshen Administrative...
-
Description: Testing and Commisioning, for educational facilities repaired and reconstructed under “EU4Schools” Programme.
Contractor: UNDP Albania
Periode: 2022-2023
-
Project: Architect and Engineering (A&E) Services for DFAC, Gym and Power Upgrade, Camp Nothing Hill, Kosovo.
Contractor: NATO
Period: 2022
-
Testing of: "Construction of a new road along the Osum River and improvement interventions on the Bypass of Antipatrea road and rehabilitation of the connecting road between Osumi promenade and...
-
Testing of: "Construction of the Football House", Tirana
Contractor: Albanian Football Federation
Started: 2021
-
Testing of: "Systematization and Asphalting of the connecting road of the quota gallery 178 mmnd in Hec Fierzë"
Contractor: Albanian Power Corporation
Started and completed in 2021
-
Description: Design of "Construction of the facility for production, storage and processing of livestock products in Rreth Tapi, Kuçova.
Investor: "Agi 11" shpk
Period: April 2021.
-
Description: Design and Supervision for construction of new fuel station “Lungomare Vlorë” in Vlora and new fuel station “Rruga Kazanxhi” in Durrës.
Investor: Kastrati Group
Period: During 2020
-
Description: Design of the building "Construction of the warehouse building, Municipality of Kuçova.
Investor: "InTex" shpk, Kuçovë
Period: February 2021.
-
Description: Design of "Construction of a 1-storey building in the village of Vlashuk, Municipality of Kuçova.
Investor: "Municipality of Kuçova"
Period: February 2021.
-
Description: Design of "Construction of the building 2 floors above ground and 1 basement floor, residential unit. Municipality of Kuçova
Investor: Private: Xhevit Lleshi, Ilirjana Lleshi, Aishe...
-
Description: Design of "Road construction, connection of Milot Morina highway with Kukës international airport" Zayed Flatrat e Veriut ", Kukës
Investor: "Salillari" shpk
Period: March 2021
-
Description: Design of "Improvement of road Ura e Kuçit-Malas Bregë and improvement of asphalt layers, Municipality of Ura Vajgurore.
Investor: Municipality of Ura Vajgurore
Period: February 2021.
-
Description: Design of "Construction of water supply for the villages of Lumas, Pëllumbas, Bardhaj, Sheqëz, Krekëz and Koritëz, Lumas administrative unit and also Partial construction in the village...
-
Description: Testing service for the facility: Requalification of "Italia" square, Tirana.
Investor: Albanian Development Fund
Period: January 2021.
-
Description: Testing service for: “Improvement of road layers for Region 1 and 3”, respectively:
Improvement of the Fishta Entrance-Exit junction and improvement of the road layers for the National...
-
Description: Testing of works for the reconstruction of educational facilities in the Municipality of Durrës, respectively:
· 9-year school and kindergarten "Bedrije Bebeziqi", Municipality of...
-
Description: Testing of works for improvement, construction, operation and maintenance of Arbri Road in different phases of implementation of works.
Investor: GJOKA 87 shpk
Period: Completed during...
-
Description: Testing of "Construction of residential complex Green Coast Luxury Resort" which includes the construction of villas and residential premises, interior roads, plumbing, underground...
-
Description: Testing of "Construction of residential complex Green Coast Luxury Resort" which includes the construction of villas and residential premises, interior roads, plumbing, underground...
-
Description: testing of “Construction of buildings, offices, silos, streets and squares, perimeter walls, water supply and sewerage of the offices of the company "Salillari" shpk in Vora, Tirana”....
-
Description: Construction of Bathore Catholic Church, Tirana
Investor: Tirana-Durrës Metropolitan Archdiocese
Period: Test completed in 2014.
-
Description: Project testing: Construction of water supply system in the village of Tropojë e Vjetër and surroundings, administrative unit Tropojë Fshat. Construction of water supply system of Luzhë...
-
Description: Project testing: High water system Fierzë and Margegaj, System in the neighborhoods of the city "Bajram Curri" and Reconstruction of the football field, Bajram Curri. This project...
-
Description: Project testing: Construction of the "Park Gate" residential area and service facility. This project includes the construction of the residential and service complex "Park Gate" in...
-
Description: Project testing: Requalification and Asphalting of road Mërtish - 3 Urat, Divjaka Municipality. This project includes the works for the systematization and asphalting of the road Mërtish...
-
The project includes the reconstruction of the 9-year school in the village of Shënepremte as well as the construction of a side addition to this school. Completed in 2019. Investor: "Municipality of...
-
The project includes the construction of industrial facilities, offices and service 1-2 floors above ground. Completed in August 2018. Investor: "BLAED Trade" sh.p.k.
-
This project includes the construction of the carbine, control of sanitary and electrical installations, control of refineries. Started in November 2017 and completed in May 2018. Investor: "BLAED...
-
Started and completed in 2015. Investor: "Municipality of Divjaka".
-
Started in 2008 and completed in 2009. Investor: "Municipality of Kruja".
-
Started in 2008 and completed in 2009. Investor: "Municipality of Kruja"
-
Started in 2010, Investor: "Universal"
-
Description: Supervision of works for the object "Construction of Adventure Park, Puka"
Investor: Albanian Development Fund
Period: Started in January 2021 and ongoing
-
Description: Supervision of works for the reconstruction of collective housing Building in the new development area Shijak, Shijak Administrative Unit, Shijak Municipality, Lot 1.
Investor: Albanian...
-
Description: Supervision of works for the building Construction of building 15 A in the development zone "5 Maji" in the city of Tirana, in the framework of the accelerated procedure for the...
-
Description: Supervision of works for the building Construction of building 41 / A2 in the development zone "5 Maji" in the city of Tirana, in the framework of the accelerated procedure for the...
-
Description: Supervision of works for the building Construction of building 20 in the development zone "5 Maji" in the city of Tirana, in the framework of the accelerated procedure for the...
-
Description: Supervision of works for the facility Construction of TIP building in RSU No.3 (No. 1). in the administrative unit no. 11, in the city of Tirana within the accelerated procedure for the...
-
Description: Project supervision: Civil works for side addition with 1 and 2 floors, addition with 2 floors, addition with 1 floor, reconstruction and renovation of the facade, "Bylis" street, in...
-
Description: Supervision of works for the procurement procedure with object: “Construction of water supply for the villages of Lumas, Pëllumbas, Bardhaj, Sheqëz, Vodëz, Krekëz and Koritëz, Lumas...
-
Description: Supervision of: “Reconstruction of the external and internal water supply network in the village of Progonat” and “Reconstruction of the external and internal water supply network in the...
-
Description: Design of: "Construction Water supply, external and internal network, administrative unit Cukalat, Municipality of Ura Vajgurore"
Investor: Ura Vajgurore Municipality
Period: June 2020...
-
Description: Supervision of construction - assembly works for the building Water supply for the city of Rubik.
Investor: Municipality of Mirdita
Period: Started in July 2020 and ongoing.
-
Description: This project includes the construction of mountain slope protection over the exits of discharge tunnels no.3 and no. 4 in HPP Fierzë.
Investor: Albanian Power Corporation.
Period:...
-
Description: Project supervision: Construction of a New Bridge over the Lana River, at the New Maternity Hospital, Tirana.
Investor: Municipality of Tirana.
Period: Started in 2007 and completed in...
-
Description: Supervision of works "Urban revitalization and improvement of access to areas with agricultural activity in Region No. 3".
Investor: Albanian Development Fund.
Period: November 2019 -...
-
Description: Reconstruction of Salari-Nivica road, Tepelena Municipality “;
Investor: Albanian Development Fund
Period: Started in November 2020 and ongoing
-
Description: Supervision of: "Entrance-exit reconstruction and stabilization of the slide at the entrance of the city of Pogradec".
Investor: Albanian Development Fund.
Period: Started in November...
-
Description: Supervision of: "Reconstruction of the road Kuqan-Bujqës-Jagodinë-Murriqan-Thanë" Elbasan.
Investor: Albanian Development Fund.
Period: Started in November 2019 and completed in August...
-
Description: Supervision of the facility "Urban requalification of the block bordered by the streets" Ahmet Bektashi "," Mehmet Peti "," Fan Noli "as well as the revitalization of the park" Rinia "in...
-
Description: The project of reconstruction of the road "Lekdushk-Bënçë-Tepelena", Lot I, consists in the design of road elements of category C according to Albanian standards, including the design of...
-
Description: Independent engineering services for the implementation of the concession / PPP contract for the rehabilitation, maintenance and operation of Kukës International Airport.
Investor:...
-
Description: Design of reconstruction of the road "Lekdush-Benc-Tepelene, Lot I”
The design consists in a road type C according to the Albanian Standards with a all the structures as pipes,...
-
Description: Project testing: Construction of Shopping Center Tirana East Gate - TEG, Tirana. The project has an area of 95218 m², facade and futuristic lighting, 2 floors for business development...
-
Description: Project testing: Elbasan Arena Stadium, Elbasan. The project includes the construction of the stadium "Elbasan Arena", the construction of the road around the stadium which is connected...
-
Description: Project testing: Construction of "Rolling Hills" Residential Complex, Tirana. The project includes the construction of 128 villas, swimming pools, a club, park and other recreational...
-
Description: Project testing: Requalification of the New Bazaar and Construction of the New Fish Market, Tirana.
Investor: Municipality of Tirana
Period: Started and completed in 2017.
-
Description: Supervision of infrastructure reconstruction and urban requalification in block no. 45 in Tirana. Supervision of all roads, including underground infrastructure and electrical works,...
-
Description: Supervision of the Road Infrastructure Reconstruction and Urban Requalification of Block 59, Tirana, including the area between "Bajram Curri" Street, "Ali Demi" Street, and "H. Stafa"...
-
Description: Project supervision: Construction of DTA Multifunctional Building – Down Town Albania DTA, Tirana. The project includes construction of 37 floors (housing, services and hotels) with 5...
-
Description: Project supervision: Reconception of the Playground and construction of underground parking 2 floors, Elbasani street, Tirana. The project includes the systematization of an area of 3820...
-
Description: Project supervision: Reconceptualization of the Fountain at "Zogu i Zi", Tirana. This project includes works for the requalification of the fountain at "Zogu i Zi", Tirana.
Investor:...
-
Description: Project supervision: Construction of the "White Rocks" Tourist Complex, Drimadhe beach. The project involves the construction of three different types of villas with a...
-
Description: Project supervision: Construction of the Residential Complex "New Born-Vala Mar", Hamallaj, Lalzi Bay, Durrës. The project includes the construction of 59 different types of villas and...
-
Description: Supervision of: Reconstruction of 30 branches of Raiffeisen Bank throughout Albania
Investor: "Raiffeisen Bank"
Period: Started in 2011 and completed in 2013.
-
Description: The project has a total construction area of 5310 m², with sports facilities and swimming pools with an area of 454 m², paved areas 3394 m² and green areas, sports areas and other...
-
Description: Supervision of the construction the residential and services building, 8 and 9 floors. It has 54 Apartments, 2 Floor of Service and Business Area and 2 Underground Floors of...
-
Description: Project supervision: Construction of Residential buildings and service building 6, 7, 8 floors, "Sami Frashëri" street, near the Artificial Lake, Tirana. The total area of the complex is...
-
Description: Project supervision: Construction of the building "TID Tower Hotel Plaza", street "28 Nëntori", Tirana. The project includes the construction of a 24-storey building with 4 underground...
-
Description: This project includes the construction of a 5 m high tunnel, with 2 lanes each with a width of 3.5 m, 2 sidewalks with a width of 1.2 m each, the width of the paved part 2x3 m, while the...
-
Description: This project is funded by KESH, the 2017 program for the intervention and maintenance of some dam facilities in the Vau Dejës hydropower plant.
This project includes the construction of...
-
Description: This project includes the construction of two viaducts where one viaduct is built in km 13 + 750 m with a width of 12.5 m and a length of 243.5 m and the second viaduct is built in km 14...
-
Description: Independent Engineer Services for the Milot-Morinë Highway Concession Project. This project includes supervision of:
1. Initial geotechnical works
2. Design and construction of...
-
Description: Supervision of works on villas and internal roads of the complex, temporary access roads to the site, electrical underground system, hydraulic system, fire protection, rainwater, sewer...
-
Description: This project includes the construction of a 6 km long road which starts from Lukova to near the bay of Kakome. Started in 2007 and completed in 2009.
Investor: Ministry of Public Works...
-
Description: Construction of Lot 10 and Lot 4 of Milot-Thumanë Highway, with 4 lanes with a width of 3.75 m each, 2 service or emergency lanes with a width of 3 m each, traffic dividers with a width...