Description: Supervision of the Road Infrastructure Reconstruction and Urban Requalification of Block 59, Tirana, including the area between "Bajram Curri" Street, "Ali Demi" Street, and "H. Stafa" Street, including 13 roads 3.5 m to 5 m wide , with sidewalks, reconstruction of the sewerage and water supply network, street lighting elements, etc.
Investor: Municipality of Tirana
Period: Started in 2008 and completed in 2013.