SUPERVISION OF: "CONSTRUCTION OF THE HIGHWAY FUSHË KRUJË-MILOT, LOT 10 & LOT 4"

Description: Construction of Lot 10 and Lot 4 of Milot-Thumanë Highway, with 4 lanes with a width of 3.75 m each, 2 service or emergency lanes with a width of 3 m each, traffic dividers with a width of 2.6 m, concrete ditches 2x1,25 m.

Investor: Ministry of Public Works and Transport, General Directorate of Roads.

Period: Lot 10 contract ended in 2012 while Lot 4 contract ended in 2014