SUPERVISION OF: "ROAD RECONSTRUCTION AND EXPANSION OF UJI I FTOHTË TUNNEL, VLORA".

Description: This project includes the construction of a 5 m high tunnel, with 2 lanes each with a width of 3.5 m, 2 sidewalks with a width of 1.2 m each, the width of the paved part 2x3 m, while the sidewalks 2x0.5 m. The maximum height of the tunnel is 5 m. The tunnel is a semicircle with a radius of 4.7 m. The length of the tunnel is 160 m.

Investor: Albanian Road Authority.

Period: Started in 2011 and completed in 2013.