-
Description: Supervision of works for the procurement procedure with object: “Construction of water supply for the villages of Lumas, Pëllumbas, Bardhaj, Sheqëz, Vodëz, Krekëz and Koritëz, Lumas...
-
Description: Supervision of: “Reconstruction of the external and internal water supply network in the village of Progonat” and “Reconstruction of the external and internal water supply network in the...
-
Description: Supervision of construction - assembly works for the building Water supply for the city of Rubik.
Investor: Municipality of Mirdita
Period: Started in July 2020 and ongoing.
-
Description: This project includes the construction of mountain slope protection over the exits of discharge tunnels no.3 and no. 4 in HPP Fierzë.
Investor: Albanian Power Corporation.
Period:...
-
Description: Project supervision: Construction of a New Bridge over the Lana River, at the New Maternity Hospital, Tirana.
Investor: Municipality of Tirana.
Period: Started in 2007 and completed in...
-
Description: Project supervision: Reconceptualization of the Fountain at "Zogu i Zi", Tirana. This project includes works for the requalification of the fountain at "Zogu i Zi", Tirana.
Investor:...
-
Description: This project includes the construction of a 5 m high tunnel, with 2 lanes each with a width of 3.5 m, 2 sidewalks with a width of 1.2 m each, the width of the paved part 2x3 m, while the...
-
Description: This project is funded by KESH, the 2017 program for the intervention and maintenance of some dam facilities in the Vau Dejës hydropower plant.
This project includes the construction of...
-
Description: This project includes the construction of two viaducts where one viaduct is built in km 13 + 750 m with a width of 12.5 m and a length of 243.5 m and the second viaduct is built in km 14...