SURVEILLANCE OF: "PROTECTION OF THE MOUNTAIN SLOPES ON THE EXIT OF THE DISCHARGE TUNNELS No. 3 AND No. 4 IN HEC FIERZA.

Description: This project includes the construction of mountain slope protection over the exits of discharge tunnels no.3 and no. 4 in HPP Fierzë.

Investor: Albanian Power Corporation.

Period: Started in January 2019 and completed in August 2019.