Description: Supervision of works "Urban revitalization and improvement of access to areas with agricultural activity in Region No. 3".
Investor: Albanian Development Fund.
Period: November 2019 -...
-
Description: Reconstruction of Salari-Nivica road, Tepelena Municipality “;
Investor: Albanian Development Fund
Period: Started in November 2020 and ongoing
-
Description: Supervision of: "Entrance-exit reconstruction and stabilization of the slide at the entrance of the city of Pogradec".
Investor: Albanian Development Fund.
Period: Started in November...
-
Description: Supervision of: "Reconstruction of the road Kuqan-Bujqës-Jagodinë-Murriqan-Thanë" Elbasan.
Investor: Albanian Development Fund.
Period: Started in November 2019 and completed in August...
-
Description: Supervision of the facility "Urban requalification of the block bordered by the streets" Ahmet Bektashi "," Mehmet Peti "," Fan Noli "as well as the revitalization of the park" Rinia "in...
-
Description: The project of reconstruction of the road "Lekdushk-Bënçë-Tepelena", Lot I, consists in the design of road elements of category C according to Albanian standards, including the design of...
-
Description: Supervision of infrastructure reconstruction and urban requalification in block no. 45 in Tirana. Supervision of all roads, including underground infrastructure and electrical works,...
-
Description: Supervision of the Road Infrastructure Reconstruction and Urban Requalification of Block 59, Tirana, including the area between "Bajram Curri" Street, "Ali Demi" Street, and "H. Stafa"...
-
Description: Independent Engineer Services for the Milot-Morinë Highway Concession Project. This project includes supervision of:
1. Initial geotechnical works
2. Design and construction of...
-
Description: Supervision of works on villas and internal roads of the complex, temporary access roads to the site, electrical underground system, hydraulic system, fire protection, rainwater, sewer...
-
Description: This project includes the construction of a 6 km long road which starts from Lukova to near the bay of Kakome. Started in 2007 and completed in 2009.
Investor: Ministry of Public Works...
-
Description: Construction of Lot 10 and Lot 4 of Milot-Thumanë Highway, with 4 lanes with a width of 3.75 m each, 2 service or emergency lanes with a width of 3 m each, traffic dividers with a width...